Internationalisation Consulting
Internationalisation Consulting
  • Sign In
  • Create Account

  • My Account
  • Signed in as:

  • filler@godaddy.com


  • My Account
  • Sign out

Signed in as:

filler@godaddy.com

  • Home
  • About Us
    • Vision and Mission
    • Organisation and Values
    • Meet Our Team
  • Our Services
    • Our Advisory Services
    • Business Outsourcing
    • CCP Support Services
    • Grant Support Services
    • F&B Business Consulting
    • Franchising Opportunity
  • Internationalisation
  • Mission Trips
    • Business to Sarawak
    • Business to Batam
  • Outbound Trips
  • Match Business Club
  • Our Events
  • BD Projects
    • Jababeka Industrial Park
  • Contact Us

Account


  • My Account
  • Sign out


  • Sign In
  • My Account

A Self Generating Economy, Contributing to 54% of Indonesia Overall GDP

Introducing Jababeka Cikarang Industrial Park

Founded in 1989, Jababeka Cikarang Industrial Park today hosts over 5000 Tenants with 45% MNCs from 150 countries including (Unilever, Samsung, Mattel, Kao, Loreal, and more). It is an integrated township with world class infrastructure from more than 650MW Power Plant, Water Treatment, World Class University, Hotels, Malls, Housing, and More. Modelled after Singapore, Jababeka Cikarang Industrial Park today is a powerhouse township where locals and International communities resides, work, and play with 100% Clarity and Transparency

WhatsApp us for More Info

Integrated Infrastructure Support

Water Treatment Plant

Water Treatment Plant

Water Treatment Plant

World Class Water Treatment Facilities with less than 0.5% NPR. There are 2 Treatment Plants

Plant 1: Capacity 400 Liters Per Second 

Plant 2: Capacity 200 Liters Per Second


Power Plants

Water Treatment Plant

Water Treatment Plant

Within Jababeka Industrial Park, there are 2 Privately Run Power Plant with a combined capacity of 725MW. 

Cikarang Listrindo - Capacity of 600 MW 

Bekasi Power - Capacity of 125 MW

Telecommunication

Water Treatment Plant

Waste Water Treatment Plant

The Industrial Park is covered with High Specs Fiber Optics and Supports 5G Connections throughout 


ICTEL (with CCTV & Fire Fighter Brigade) 

Waste Water Treatment Plant

Natural Gas Pipes and Supplies

Waste Water Treatment Plant

While Indonesia has not began, Jababeka has already start recycling our own Waste Water. We have 2 Waste Water Treatment Plant

WWTP Plant 1: Capacity is 208 L Per Second

WWTP Plant 2: Capacity is 125L Per Second

Natural Gas Pipes and Supplies

Natural Gas Pipes and Supplies

Natural Gas Pipes and Supplies

Availability of Natural Gas Piping directly to the Factories and managed as well as operated by Pertagas. Indonesia State Owned Gas Distribution Company. 

The Rate is US$16.62 per MMBTU 

Cikarang Dry Port

Natural Gas Pipes and Supplies

Natural Gas Pipes and Supplies

International and the First Privately Operated Dry Port in Indonesia. Connected by Land and Railway, tenants can directly import or export from the Dry port handling over 4 million TEUs per year.  Over 240 HA of Development. 

Jababeka Corporate Video (ENGLISH)

Jababeka Official Corporate Video to showcase to you, the overall picture of our company and development. 

Why Invest in Indonesia and Starts in Jababeka IP

Indonesia has over 270 Million People and a GDP 5 times Vietnam at USD$1.2 Trillion Per Annum

Indonesia today has a GDP of USD1.2 Trillion per annum and a strong domestic market with MNCs manufacturers are able to off load 40% of their productions to the local market. 60% of the Indonesian GDP is generated from Jakarta and surrounding areas with Cikarang to be one of the main contributors with over 21 Industrial Estates operating there and over 21,000 companies are based there. Jababeka Industrial Park is the first and largest privately run Industrial Park with their own infrastructure facilties and operations. Our clusters are spread equally from Automotives, Food, General Electronics, Warehousing, FMCG, Plastics, Packaging, and more. We have over 700K workers working in our Industrial Park. 

Site Map (Jababeka Cikarang Industrial Park)

Jababeka Town Map

Currently the development area in Cikarang has reached to more than 5600 Hectares divided into 9 Phases where Phase 1 to Phase 8 have been mostly developed and sold. Phase 9 is the new site development connected to the east, direct access highway to Tg Perak Surabaya and also to the North West, connected to railway tracks that has direct access to Cikarang Dry Port, which makes it easy for shipment and clearance. 

Jababeka Phase 9 Development

1 Hour East from Jakarta Exit 29, 31, and 34.7

1 Hour East from Jakarta Exit 29, 31, and 34.7

1 Hour East from Jakarta Exit 29, 31, and 34.7

Our development in Cikarang is located strategically 30km to the east of Jakarta towards Bandung. We have a total 3 exits directly from the highway. Jababeka Phase 9 has a direct access from the North East exit from the Park connecting South directly to the Highway. 

Jababeka Phase 9 Site Map

1 Hour East from Jakarta Exit 29, 31, and 34.7

1 Hour East from Jakarta Exit 29, 31, and 34.7

This new area housed the new Jababeka Bizpark, which is designed for Medium Sized Manufacturing and Warehousing with a total area development of over 22 Hectares. Total more than 13 factories are already located there and some in progress of completing their factories. 

Information on Essential Infrastructure Services and Rates

Clean Water Supply

Clean Water Supply

Clean Water Supply

Total Water Capacity: 63,000 m3/ day

Monthly Operating Charge 

Industrial Plot/ Multiuse Building

US$0.84 per m3



Waste Water Supply

Clean Water Supply

Clean Water Supply

Total Capacity 35,000 m3

Monthly Operating Charge 

Industrial Plot: US$0.845 per m3

Multiuse Building: US$0.825 per m3


Electricity Rate

Clean Water Supply

Internet Connection

Capacity: 130MW - 650MW

Connection Charge

IDR2.058 per kva


Internet Connection

Internet Connection

Internet Connection

288 core up to 100Gbps 

Monthly Operating Charge 

50 Mbps Min IDR 2 Mil Max IDR 9 Mil

80 Mbps Min IDR 4 Mil Max IDR 12 Mil

100 Mbps Min IDR 4 Mil Max IDR19 Mil

Maintenance Charge

Internet Connection

Maintenance Charge

Estate Charge: 

US$0.0749/ m2


Waste Disposal 

US$3.5 per m3

Gas

Internet Connection

Maintenance Charge

The gas price is supplied by PT Nusantara Gas Energy (NGE) 

Price Varies and will need to be confirmed upon request 

Range from US$10 - US$19 per m3

Contact Us Today for Appointment

Match Advisory is the official representative office for International Clients for Jababeka based in Singapore. Please feel free to contact us at +65 8169 8264 or email us at ask@match-advisory.com for more information. Better still, book appointment with us below. 

Book Appointment

Ready Industrial Building Products (RBF)

Jababeka BizPark

Multipurpose BizPark

Multipurpose BizPark

Jababeka Biz Park Unit With a total built up area of 153 m2

The BizPark Jababeka is the most modern warehousing in Cikarang, with the best facilities that will support your business. With a total built up area of 153 m2. 


BizPark Jababeka has easy

accessibility that would facilitate efficient production and conducive for loading and unloading. Suitable for SMEs Operations

Multipurpose BizPark

Multipurpose BizPark

Multipurpose BizPark

Differing than Jababeka Bizpark unit, the multipurpose Bizpark unit can be used for beyond industrial and warehousing including office and shop. With 9 meter ceiling, SMEs can plan the best layout or optimization for their operational and business usage. 

E-Space Block

Multipurpose BizPark

The Supporting Industry Building

The e-space block is designed specially for any type of industries, with total building area is 828 m2.


This facility will maximize the area utilization for various industries such as automotive, electronic, machinery, food & beverages and furthermore. This building is also suitable for the small and medium enterprises (SME).

The Supporting Industry Building

The Supporting Industry Building

The Supporting Industry Building

The Supporting Industrial Building is a specially designed factory for home industry, with a total built up area of 155 m2. 


This facility will give maximum the area utilization with an integrating

section comprises of production area, office and living area. This unit is suitable for the small and medium enterprises (SME).

The Three in One Building

The Supporting Industry Building

The Three in One Building

The total area of New Three in One Building is about 435 m2 specially designed for storage or production workshop area. Electricity, telecommunication network, water and waste water channel are also supplied. 


The New 3 in 1 Factory Building has the accessibility that would facilitate

efficient production and be conductive for loading and unloading. This new design will provide a maximum flexibility at a lowest cost, and would be the best choice for many business entrepreneurs.

Copyright © 2026 Match Advisory Website - All Rights Reserved.

Powered by

  • Business Outsourcing
  • Internationalisation
  • Jababeka Industrial Park

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept